Avoid These 5 Construction Loan Approval Mistakes

A friendly guide for Murrumbateman residents planning to build, covering what lenders look at and how to prepare before you apply.

Hero Image for Avoid These 5 Construction Loan Approval Mistakes

Construction loan approval depends on your build plans and contract as much as it does on your finances. Murrumbateman is known for its wine region and rural lifestyle blocks, and building here often means a mix of land, council steps and a builder's contract. Getting these lined up before you apply makes the process much smoother.

If you are planning to build, a local mortgage broker in Murrumbateman can help you work out what a lender will want to see. Our construction loans page covers the basics. This article covers five mistakes to avoid.

Why Do Construction Loans Need More Than a Standard Home Loan?

A construction loan is assessed on you and on the build itself. A lender looks at your income and debts, and also at the plans, the builder's contract and the value of the finished home.

APRA requires banks and other ADIs to assess new home loan borrowers at a rate at least 3 percentage points above the loan rate. APRA reconfirmed this setting on 25 November 2026. Non-bank lenders are not bound by the APRA rule, and each lender's own policy applies. Lenders generally assess construction loans in the same way, but confirm this with your lender. Lenders set their own rules on drawdowns, fees and time limits, so these differ from one lender to the next.

Mistake 1: Applying Before Your Contract and Plans Are Ready

You should apply with a signed fixed price building contract, or a draft ready to sign, and your plans in hand. Lenders want to see exactly what is being built and for how much.

Under the Home Building Act 1989 (NSW), work over $20,000 needs a large job contract, and that contract must include a progress payment schedule. The maximum deposit is 10 per cent. Lenders typically review the building contract, and the drawdown arrangements are set by the lender, so confirm this with your lender before applying.

The trade-off is timing. A contract signed early can lock you in before you know what a lender will offer, so have a broker check it first.

Mistake 2: Overlooking Planning and Building Approvals

Lenders generally require the relevant planning and building approvals, either a development consent or a complying development certificate, before funds are released. Ask your lender what it needs. Delays with approvals can push back your start date.

Murrumbateman sits in the Yass Valley Council area, so check with council about what your block needs. Rural blocks can have extra requirements, so it is worth asking early rather than assuming.

Ready to get started?

Book a chat with a Finance & Mortgage Broker at Panache Financial today.

How Do Progress Payments Work on a Construction Loan?

A construction loan is released in stages as the build progresses, rather than as one lump sum. Interest is commonly charged on the amount drawn rather than the full approved limit, but confirm the lender's terms.

NSW Government guidance says a borrower financing a project home must start mortgage repayments once the first progress payment is made and the loan begins to draw down. Building Commission NSW gives $250 to $500 as an indicative cost for each progress inspection by an external inspector. Some lenders also charge their own fees for each drawdown, so ask about this upfront.

Progress payments must match work actually carried out. Paying a builder ahead of the work can affect your insurance cover and your legal protections, so check the Home Building Compensation Scheme and your contract terms.

Mistake 3: Forgetting That Repayments Start During the Build

Plan for repayments to begin as soon as the first drawdown happens. They are small at first and grow as more of the loan is released.

As an illustration only, using an example rate of 6.75% p.a., interest on a $400,000 balance fully drawn would be about $27,000 a year, or roughly $2,250 a month, if interest-only. Early in the build, when only a fraction is drawn, the interest is much lower. Your actual rate will depend on your deposit size and lender. Use our borrowing capacity tools to see how this may look for you.

The trade-off with interest-only repayments is that you are not paying down the loan. Once principal and interest begins, repayments are calculated over the shorter remaining term, so they will be higher.

Mistake 4: Leaving Your Budget Without a Buffer

A realistic budget includes extra room for costs that were not in the original quote. A lender will test the numbers, and so should you.

Consider a buyer building on a rural block outside the village. The fixed price contract covered the house, but the driveway, a water tank and power connection were not included. The buyer spoke to a broker before applying. The broker included those costs in the loan amount and the application. The lender had a complete picture, the build was valued correctly, and the buyer avoided scrambling for cash halfway through the build.

Adding costs to the loan means borrowing more, so interest will be higher. Weigh that against the risk of a stalled build.

Are You Eligible for a First Home Owner Grant When Building?

If you are a first home buyer building in NSW, you may qualify for the $10,000 First Home Owner Grant, as listed by Revenue NSW. For vacant land with a building contract, the combined value of the land, contract and any variations must not exceed $750,000.

Applications needed for a first drawdown or progress payment go through the approved agent providing the finance. The home must also be occupied as your principal place of residence for at least 12 continuous months within 12 months of construction or purchase, for contracts signed on or after 1 July 2023. Our first home buyers page has more detail.

Mistake 5: Choosing a Lender Without Comparing Construction Terms

Lenders differ on the number of drawdowns, inspection requirements, fees and time limits to finish the build. A broker can compare construction loan options from the lenders on their panel.

The trade-off is that a lender with flexible terms may charge higher fees or a higher rate, so look at the whole package. If you plan to buy rural land first, our rural loans page explains how lenders view larger blocks.

Your broker can also check whether your loan will convert to a standard home loan once the build ends. Ask about any change in rate or fees at that point.

Ready to build in Murrumbateman? Call one of our team or book an appointment at a time that works for you. We will go through your plans, contract and numbers before you apply.

Frequently Asked Questions

What do lenders look at for construction loan approval?

Lenders assess your income, debts and ability to repay, plus your plans and building contract. They generally also require the relevant planning and building approvals, and look at the expected value of the finished home.

When do repayments start on a construction loan?

NSW Government guidance says repayments start once the first progress payment is made and you begin to draw down. They usually grow as more of the loan is released.

Is there a maximum deposit for a building contract in NSW?

Under the Home Building Act 1989 (NSW), the maximum deposit is 10 per cent. Work over $20,000 also needs a contract with a progress payment schedule.

Can I get the First Home Owner Grant if I build?

In NSW, the grant is $10,000 and can apply to vacant land with a building contract. The combined land, contract and variations value must not exceed $750,000.


Ready to get started?

Book a chat with a Finance & Mortgage Broker at Panache Financial today.